Daoqingzhou Bridge is an important river crossing channel connecting Fuzhou urban area and Binhai New City. The completion and opening to traffic of the project are conducive to improving the backbone traffic network of urban clusters on both sides of the Wulong River. During the construction period of the project, HL Kattor ensured the safety, efficiency, and high-quality completion of the project with professional technology, a perfect construction scheme, and detailed construction steps, laying a solid foundation for subsequent engineering services and supplied equipment like:
KTTS-2000- Hydraulic Lifters
KTYA-60 Hydraulic Pump Source System
KT-1 Computer Synchronous Control System