  • Project : Hubei Shishou Yangtze River Bridge
  • Service :
  • Date : 10 Jan, 2023
  • Status :

Project Description

HL-Kattor supported China Railway Bridge Bureau and other companies during the three years of the Shishou Yangtze River Bridge's construction by using a variety of equipment and offering technical services that were independently developed by HL-Kattor engineers, such as lifting, sliding, gluing, tensioning, and grouting of large tonnage concrete beams; the intelligent level monitoring system; and three-dimensional control system. Derrick cranes were also provided during the construction phase by HL-Kattor.

The whole weight of the movable form-work, 500T, was lifted to the top of the pier using 4 sets of 200T hydraulic lifting and lowering systems, 2 sets of pumps, and 1 set of PLC, all in accordance with the lifting weight plan.