HL-Kattor.Heavy Duty Transportation Integrated Solution Provider

  • Project : Taizhou Bay Bridge project
  • Service :
  • Date : 11 Aug, 2023
  • Status :

Project Description

This segmental launching gantry is by far the largest in China. The design is versatile, takes into account various operating situations, and automatically adjusts the supporting leg and rotating spreader. The equipment can be used to build segmental bridges with a span under 75 meters.

JP2000-75 Segmental launching Gantry Technical parameters

Capacity

2000ton

Span

39m-75m

Segment weight

220t

Spreader Rotating angle

360°

Total length

188m

Self-weight

1800t

Lifting height

70m

Moving speed

0-1m/min

Horizontal moving speed

0.5m/min

Girder feeding method

Front/ Rear/ Below

Segmental

assembling

Full-span cantilever assembling

methods


Symmetrical cantilever



assembling



Semi-span cantilever



assembling


Project Images

Go To Top
0.1394s