HL-Kattor.Heavy Duty Transportation Integrated Solution Provider

  • Project : MTE200T Straddle carrier
  • Service :
  • Date : 11 Aug, 2023
  • Status :

Project Description

In the casting yard of the Hong Kong-Zhuhai-Macao Bridge project, a HL-KATTOR 200t tyre gantry crane is employed to transport concrete box girder both vertically and horizontally. The machinery is self-powered, and it features two-layer stacking capability and 90 ° load-condition steering on the tyre traveling system.

Technical Parameters

Item

MTE200T

Rated lifting

capacity

200T (100T+100T)

Lifting height

16m

Span

24m

Lifting speed

No load 0~4.0m/min

Load 0~2.0m/min

Travel speed

Load 0~20m/min

No load 0~40m/min

Maximum

Longitudinal slope

≤2.5%

Number and types of tires

16pcs*21.00-35

Steering angle

-10°~ 95°

Tire pressure

8.0 ± 0.5 bar

Generator power

200kW

Power Supply

380V, 3P, 50Hz


Project Images

Go To Top
0.1206s