HL-Kattor.Heavy Duty Integrated Solution Provider

  • Project : ME50+15-24(5+5)/12(-30) A7 Rail-mounted Gantry crane
  • Service :
  • Date : 11 Aug, 2023
  • Status :

Project Description

This was used on Line 7 of the Shenzhen Metro. It was utilized to raise and dump debris and construction materials from the subway construction base. The apparatus uses hooks for lifting pipe segments and booms for slag buckets.

Working grade

A7

Hook Capacity

50T+15T

Lifting speed

1-11m/min

Lifting height

12m over ground & 30m under ground

Travelling speed

2-20m/min

Weight

158t

Power

215wK

Span

24m and adjustable

Cantilever Length

5m


Project Images

Go To Top
0.1351s