HL-Kattor.Heavy Duty Integrated Solution Provider

  • Project : Guangshen Riverside Highway (Shenzhen section), China
  • Service :
  • Date : 11 Aug, 2023
  • Status :

Project Description

 2400t/60m prefabricated beam is transported from the precast yard through the transverse and longitudinal movement with the beam

trolley on rail sleepers, and transported to the hosting dock for the floating

crane transporting.

Technical parameters

Vertical cylinder capacity

300T×12

Horizontal cylinder capacity

30T×4

Jacking speed

0-0.014m/min

Maximum wheel pressure

400kN

Slope

≤1.5%

Longitudinal speed

0-1.6-3.2m/min

Weight

2×58=116t

Power

55kw


Project Images

Go To Top
0.1318s